Continuous treatment of the organic fraction of municipal solid waste in an anaerobic two-stage membrane process with liquid recycle
The stability and performance of a two-stage anaerobic membrane process was investigated at different organic loading rates (OLRs) and Hydraulic Retention Times (HRTs) over 200 days. The Hydrolytic Reactor (HR) was fed with the Organic Fraction of Municipal Solid Waste (OFMSW), while the leachate fr...
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/83333 http://hdl.handle.net/10220/42520 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |