Day-ahead scheduling of distribution level integrated electricity and natural gas system based on fast-ADMM with restart algorithm
Power generated by the natural gas (NG) is a promising option for solving the restrictions on the development of the power industry. Consequently, the high interdependence between NG network and electricity network should be considered in this integration. In this paper, a day-ahead scheduling frame...
Saved in:
Main Authors: | , , , |
---|---|
Other Authors: | |
Format: | Article |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/87724 http://hdl.handle.net/10220/45487 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |