A simplified model of catenary action in reinforced concrete frames under axially restrained conditions
From previous experimental studies on missing column scenarios, catenary action could provide beneficial effects on structures during load redistribution after a target column is suddenly removed under an alternative load path procedure to assess structural resistance to progressive collapse. Howeve...
Saved in:
Main Authors: | Pham, Anh Tuan, Tan, Kang Hai |
---|---|
Other Authors: | School of Civil and Environmental Engineering |
Format: | Article |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/88874 http://hdl.handle.net/10220/46148 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Effect of partial debonding on catenary action of reinforced concrete frames
by: Yu, Jun, et al.
Published: (2013) -
Partial hinge detailing to improve catenary action of reinforced concrete frames
by: Yu, Jun, et al.
Published: (2013) -
Catenary action of reinforced concrete beams subjected to missing column scenario
by: Lim, You Gen.
Published: (2010) -
Investigation of axial-flexural behaviour of concrete-encased concrete-filled steel tube slender beam–columns
by: Wu, Nuoxin, et al.
Published: (2024) -
Considering catenary action in designing end-restrained steel beams in fire
by: Yu, H.X., et al.
Published: (2014)