Two-stage stochastic scheduling of transportable energy storage systems for resilient distribution systems
Transportable energy storage systems (TESSs) provide critical flexibility to enhance the distribution system (DS) resilience. In this paper, a two-stage stochastic restoration scheme is proposed to minimize the total cost. In this model, uncertainties of load consumption and PV power are considered...
Saved in:
Main Authors: | , , , , |
---|---|
其他作者: | |
格式: | Conference or Workshop Item |
語言: | English |
出版: |
2019
|
主題: | |
在線閱讀: | https://hdl.handle.net/10356/89481 http://hdl.handle.net/10220/49575 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|