A composite heuristic for the no-wait flow shop scheduling
Heuristics that explore specific characteristics of the problem are essential to find good solutions in limited computational time for many practical systems. This paper first presents a constructive heuristic, namely improved standard deviation heuristic (ISDH), by combining the standard deviation...
Saved in:
Main Authors: | , , |
---|---|
其他作者: | |
格式: | Conference or Workshop Item |
語言: | English |
出版: |
2013
|
主題: | |
在線閱讀: | https://hdl.handle.net/10356/96842 http://hdl.handle.net/10220/11988 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Nanyang Technological University |
語言: | English |