Embedding simulation in yard crane dispatching to minimize job tardiness in container terminals

Two optimal algorithms, MTA* and MT-RBA*, are presented to find the optimal yard crane (YC) job sequence for serving a fleet of vehicles for delivery and pickup jobs with scheduled deadlines and predicted vehicle arrival times. The objective is to minimize the total tardiness of incoming vehicle job...

Full description

Saved in:
Bibliographic Details
Main Authors: Huang, Shell Ying, Guo, Xi, Hsu, Wen Jing, Lim, Wei Lin
Other Authors: School of Computer Engineering
Format: Conference or Workshop Item
Language:English
Published: 2013
Subjects:
Online Access:https://hdl.handle.net/10356/99035
http://hdl.handle.net/10220/12795
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English