Embedding simulation in yard crane dispatching to minimize job tardiness in container terminals

Two optimal algorithms, MTA* and MT-RBA*, are presented to find the optimal yard crane (YC) job sequence for serving a fleet of vehicles for delivery and pickup jobs with scheduled deadlines and predicted vehicle arrival times. The objective is to minimize the total tardiness of incoming vehicle job...

全面介紹

Saved in:
書目詳細資料
Main Authors: Huang, Shell Ying, Guo, Xi, Hsu, Wen Jing, Lim, Wei Lin
其他作者: School of Computer Engineering
格式: Conference or Workshop Item
語言:English
出版: 2013
主題:
在線閱讀:https://hdl.handle.net/10356/99035
http://hdl.handle.net/10220/12795
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Nanyang Technological University
語言: English