Single item lot-sizing problems with backlogging on a single machine at a finite production rate
10.1016/j.ejor.2003.04.001
Saved in:
Main Authors: | Song, Y., Chan, G.H. |
---|---|
Other Authors: | MATHEMATICS |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/104627 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Simulation-Based Impacts on Environment Costs Caused by Production Lot Size
by: Zhao, Run
Published: (2016) -
Dynamic lot-sizing model for major and minor demands
by: Hwang, H.-C., et al.
Published: (2014) -
A dynamic model for inventory lot sizing and outbound shipment scheduling at a third-party warehouse
by: Lee, C.-Y., et al.
Published: (2014) -
The critical cut-off value approach for dynamic lot sizing problems with time varying cost parameters
by: Chan, G.H., et al.
Published: (2014) -
Outbound shipment mode considerations for integrated inventory and delivery lot-sizing decisions
by: Jaruphongsa, W., et al.
Published: (2014)