Trade-level productivity measurement: Critical challenges and solutions
10.1061/(ASCE)CO.1943-7862.0000761
Saved in:
Main Authors: | Hwang, B.-G., Soh, C.K. |
---|---|
Other Authors: | BUILDING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/114038 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Assessing the implementation of best productivity practices in maintenance activities, shutdowns, and turnarounds of petrochemical plants
by: Krishnankutty, P., et al.
Published: (2021) -
TRADE LEVEL PRODUCTIVITY MEASUREMENT: CHALLENGES AND SOLUTIONS FROM THE PERSPECTIVE OF LOCAL CONTRACTORS
by: Soh Chin Kiat Adrian
Published: (2012) -
Construction project change management in Singapore: Status, importance and impact
by: Hwang, B.-G., et al.
Published: (2013) -
Performance and practice use comparisons: Public vs. Private owner projects
by: Hwang, B.-G., et al.
Published: (2013) -
Prioritizing critical management strategies to improving construction productivity: Empirical research in Singapore
by: Hwang, B.-G., et al.
Published: (2021)