Rework in complex offshore projects: The case of oil and gas tension leg platforms
COBRA 2010 - Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors
Saved in:
Main Authors: | Love P.E.D., Goh Y.M., Han S. |
---|---|
其他作者: | BUILDING |
格式: | Conference or Workshop Item |
出版: |
2018
|
在線閱讀: | http://scholarbank.nus.edu.sg/handle/10635/139235 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Dynamics of rework in complex offshore hydrocarbon projects
由: Love P.E.D., et al.
出版: (2018) -
Hydrodynamic response and tension leg failure performance analysis of floating offshore wind turbine with inclined tension legs
由: Jia, Zhaolin, et al.
出版: (2023) -
KETIDAKSTABILAN DINAMIK TENSION LEG PLATFORM
由: Wesi Andrian, Utari -
FOUR LEGGED FIXED OFFSHORE PLATFORM DESIGN AND BOAT IMPACT ANALYSIS IN MADURA OFFSHORE
由: Candy Sugianto, Vincentius -
IDENTIFIKASI VORTEX INDUCED VIBRATION PADA TENDON TENSION LEG PLATFORM
由: Landong Pordiman, Rifel