Repetitive project scheduling using genetic algorithms
Master's
Saved in:
Main Author: | TAN HENG WEE |
---|---|
Other Authors: | CIVIL ENGINEERING |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/14544 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Language: | English |
Similar Items
-
A multi-objective genetic algorithm for robust flight scheduling using simulation
by: Lee, L.H., et al.
Published: (2014) -
Multi-objective genetic algorithm for robust flight scheduling
by: TAN YEN PING
Published: (2010) -
Dynamic scheduling of manufacturing job shops using genetic algorithms
by: Chryssolouris, G., et al.
Published: (2014) -
A modified genetic algorithm for distributed scheduling problems
by: Jia, H.Z., et al.
Published: (2014) -
An application of genetic algorithms to precast production scheduling
by: Chan, W.-T., et al.
Published: (2014)