CONDITIONS OF CONTRACT FOR DESIGN AND BUILD CONTRACT
Master's
Saved in:
Main Author: | NORHAZAN ABDUL RAHMAN |
---|---|
Other Authors: | BUILDING |
Format: | Theses and Dissertations |
Published: |
2019
|
Subjects: | |
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/150743 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
ADVERSE PHYSICAL CONDITIONS (UNDER FIDIC CONDITIONS OF CONTRACT)
by: CHUNG YING YING JESSELYN
Published: (2009) -
ADAPTATION OF THE PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS FOR USE AS A STANDARD FACILITIES MANAGEMENT CONTRACT
by: TENG ZHENG ZHE TIMOTHY
Published: (2021) -
Quantum Meruit and Building Contracts: Part II Does the Contract Price put a Ceiling on a Recovery via a Quantum Meruit?
by: HUNTER, Howard, et al.
Published: (1989) -
UNDERSTANDING THE LEGAL POWER TO CONTRACT
by: IRINA SAKHAROVA
Published: (2022) -
SUB-CONTRACTING PROBLEMS IN SINGAPORE (THE PRIVATE SECTOR)
by: NG TUCK MING
Published: (2019)