TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION
Master's
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Published: |
2019
|
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/151567 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-151567 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-1515672024-10-24T16:57:53Z TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION LOW CHIN HWA @ LOW YIK HONG BUILDING LEONG HOE YUEN CHRISTOPHER Master's MASTER OF SCIENCE 2019-02-19T03:35:05Z 2019-02-19T03:35:05Z 2002 Thesis LOW CHIN HWA @ LOW YIK HONG (2002). TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION. ScholarBank@NUS Repository. https://scholarbank.nus.edu.sg/handle/10635/151567 SDE BATCHLOAD 20190218 |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
description |
Master's |
author2 |
BUILDING |
author_facet |
BUILDING LOW CHIN HWA @ LOW YIK HONG |
format |
Theses and Dissertations |
author |
LOW CHIN HWA @ LOW YIK HONG |
spellingShingle |
LOW CHIN HWA @ LOW YIK HONG TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION |
author_sort |
LOW CHIN HWA @ LOW YIK HONG |
title |
TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION |
title_short |
TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION |
title_full |
TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION |
title_fullStr |
TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION |
title_full_unstemmed |
TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION |
title_sort |
time and cost analysis of semi top down construction |
publishDate |
2019 |
url |
https://scholarbank.nus.edu.sg/handle/10635/151567 |
_version_ |
1821207516319580160 |