TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION

Master's

Saved in:
Bibliographic Details
Main Author: LOW CHIN HWA @ LOW YIK HONG
Other Authors: BUILDING
Format: Theses and Dissertations
Published: 2019
Online Access:https://scholarbank.nus.edu.sg/handle/10635/151567
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-151567
record_format dspace
spelling sg-nus-scholar.10635-1515672024-10-24T16:57:53Z TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION LOW CHIN HWA @ LOW YIK HONG BUILDING LEONG HOE YUEN CHRISTOPHER Master's MASTER OF SCIENCE 2019-02-19T03:35:05Z 2019-02-19T03:35:05Z 2002 Thesis LOW CHIN HWA @ LOW YIK HONG (2002). TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION. ScholarBank@NUS Repository. https://scholarbank.nus.edu.sg/handle/10635/151567 SDE BATCHLOAD 20190218
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
description Master's
author2 BUILDING
author_facet BUILDING
LOW CHIN HWA @ LOW YIK HONG
format Theses and Dissertations
author LOW CHIN HWA @ LOW YIK HONG
spellingShingle LOW CHIN HWA @ LOW YIK HONG
TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION
author_sort LOW CHIN HWA @ LOW YIK HONG
title TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION
title_short TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION
title_full TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION
title_fullStr TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION
title_full_unstemmed TIME AND COST ANALYSIS OF SEMI TOP DOWN CONSTRUCTION
title_sort time and cost analysis of semi top down construction
publishDate 2019
url https://scholarbank.nus.edu.sg/handle/10635/151567
_version_ 1821207516319580160