Development of a Project Planning Software Incorporating Resource-Constrained Scheduling & Project Crashing
Master's
Saved in:
Main Author: | WEN NAIJUN |
---|---|
Other Authors: | SINGAPORE-MIT ALLIANCE |
Format: | Theses and Dissertations |
Published: |
2019
|
Subjects: | |
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/153873 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
New meta-heuristics for the resource-constrained project scheduling problem
by: Lim, A., et al.
Published: (2013) -
A Hybrid Framework for Over-Constrained Generalized Resource-Constrained Project Scheduling Problems
by: LIM, Andrew, et al.
Published: (2010) -
New Meta-heuristics for the Resource-constrained Project Scheduling Problem
by: LIM, Andrew, et al.
Published: (2013) -
Resource-constrained project scheduling: A survey of recent developments
by: HERROELEN, Willy, et al.
Published: (1996) -
Mechanism design for strategic project scheduling
by: VARAKANTHAM, Pradeep, et al.
Published: (2017)