A study in joint maintenance scheduling and production planning
Master's
Saved in:
Main Author: | EHSAN ZAFARANI |
---|---|
Other Authors: | INDUSTRIAL & SYSTEMS ENGINEERING |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/15799 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Language: | English |
Similar Items
-
A maintenance model for the supply-buffer-demand production system
by: QIN TIAN
Published: (2010) -
MAINTENANCE MANAGEMENT OF KEPPEL COUNTRY CLUB
by: WEE SWEE AUN
Published: (2019) -
MAINTENANCE MANAGEMENT OF HOTEL MERIDIEN CHANGI SINGAPORE
by: LIM PHILLIP
Published: (2019) -
A branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machine
by: Ting Wang, et al.
Published: (2020) -
Joint link-and-user scheduling for buffer-aided relaying system with adaptive rate transmission
by: Luo, Sheng, et al.
Published: (2016)