ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON
Master's
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Published: |
2019
|
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/158826 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-158826 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-1588262024-10-27T02:36:32Z ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON OH HONG CHOON CHEMICAL & ENVIRONMENTAL ENGINEERING KARIMI IFTEKHAR A. Master's MASTER OF ENGINEERING 2019-09-16T02:39:47Z 2019-09-16T02:39:47Z 2001 Thesis OH HONG CHOON (2001). ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON. ScholarBank@NUS Repository. https://scholarbank.nus.edu.sg/handle/10635/158826 CCK BATCHLOAD 20190911 |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
description |
Master's |
author2 |
CHEMICAL & ENVIRONMENTAL ENGINEERING |
author_facet |
CHEMICAL & ENVIRONMENTAL ENGINEERING OH HONG CHOON |
format |
Theses and Dissertations |
author |
OH HONG CHOON |
spellingShingle |
OH HONG CHOON ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON |
author_sort |
OH HONG CHOON |
title |
ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON |
title_short |
ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON |
title_full |
ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON |
title_fullStr |
ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON |
title_full_unstemmed |
ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON |
title_sort |
economic lot scheduling problem with sequence dependent setups and fixed planning horizon |
publishDate |
2019 |
url |
https://scholarbank.nus.edu.sg/handle/10635/158826 |
_version_ |
1821231997691887616 |