Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects

10.1080/15623599.2018.1492664

Saved in:
Bibliographic Details
Main Authors: Bon-Gang Hwang, Pramesh Krishnankutty, Lei Zhu, Carlos Caldas, Arjun Shounak, Stephen P. Mulva
Other Authors: BUILDING
Format: Article
Published: Taylor & Francis 2020
Online Access:https://scholarbank.nus.edu.sg/handle/10635/176319
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-176319
record_format dspace
spelling sg-nus-scholar.10635-1763192024-03-26T04:00:49Z Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects Bon-Gang Hwang Pramesh Krishnankutty Lei Zhu Carlos Caldas Arjun Shounak Stephen P. Mulva BUILDING 10.1080/15623599.2018.1492664 International Journal of Construction Management 20 07 822-836 2020-09-16T07:17:20Z 2020-09-16T07:17:20Z 2018-10-02 Article Bon-Gang Hwang, Pramesh Krishnankutty, Lei Zhu, Carlos Caldas, Arjun Shounak, Stephen P. Mulva (2018-10-02). Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects. International Journal of Construction Management 20 (07) : 822-836. ScholarBank@NUS Repository. https://doi.org/10.1080/15623599.2018.1492664 1562-3599 https://scholarbank.nus.edu.sg/handle/10635/176319 Taylor & Francis Taylor & Francis
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
description 10.1080/15623599.2018.1492664
author2 BUILDING
author_facet BUILDING
Bon-Gang Hwang
Pramesh Krishnankutty
Lei Zhu
Carlos Caldas
Arjun Shounak
Stephen P. Mulva
format Article
author Bon-Gang Hwang
Pramesh Krishnankutty
Lei Zhu
Carlos Caldas
Arjun Shounak
Stephen P. Mulva
spellingShingle Bon-Gang Hwang
Pramesh Krishnankutty
Lei Zhu
Carlos Caldas
Arjun Shounak
Stephen P. Mulva
Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects
author_sort Bon-Gang Hwang
title Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects
title_short Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects
title_full Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects
title_fullStr Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects
title_full_unstemmed Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects
title_sort improving labour productivity in process construction maintenance and shutdown/turnaround projects
publisher Taylor & Francis
publishDate 2020
url https://scholarbank.nus.edu.sg/handle/10635/176319
_version_ 1795301163911872512