Flexible Flowlines: First Installation in Brunei
Shell TechXplorer
Saved in:
Main Authors: | Paul Ong Pang Awn, Mackenzie, S, Pendem, J, Abdul Rahman, Z |
---|---|
Other Authors: | CIVIL AND ENVIRONMENTAL ENGINEERING |
Format: | Article |
Published: |
2021
|
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/193760 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Umbilical Installation for the Champion Waterflood
by: Paul Ong Pang Awn, et al.
Published: (2021) -
PARAMETER STUDY OF OFFSHORE PIPELINES INSTALLATION USING S-LAY METHOD IN STATIC AND DYNAMIC CONDITION CASE STUDY: 16̉̉ INFIELD FLOWLINE TERANG-SIRASUN- BATUR OIL AND GAS FIELD DEVELOPMENT
by: ADRIPTA (NIM : 23109005); Pembimbing: Prof.Dr.Ir.Indra Nurhadi, PALKA -
Brunei
by: Alvarez, Francis D, et al.
Published: (2020) -
New bending stiffener concepts for easy installation in flexible risers of offshore floating structures
by: Pang, Tian Zeng.
Published: (2009) -
Boundary control of a flexible marine installation system
by: Ge, S.S., et al.
Published: (2014)