Investigating critical non-value adding activities and their resulting wastes in BIM-based project delivery
10.3390/SU12010355
Saved in:
Main Authors: | Liao, L, Teo, EAL, Chang, R, Li, L |
---|---|
Other Authors: | BUILDING |
Format: | Article |
Published: |
MDPI AG
2021
|
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/194294 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
INVESTIGATING THE ROLE OF BIM TECHNOLOGY IN FACILITATING INTEGRATED PROJECT DELIVERY (IPD) IN SINGAPORE'S CONSTRUCTION INDUSTRY
by: WEI-CHENG CHEN
Published: (2024) -
BIM-ENABLED PROJECT COST MANAGEMENT THROUGH THE PROJECT DELIVERY PROCESS
by: ANG YU QIAN
Published: (2018) -
Reducing critical hindrances to building information modeling implementation: The case of the Singapore construction industry
by: Liao, L., et al.
Published: (2021) -
WASTE-TO-RESOURCE: CONVERSION OF CARBONACEOUS WASTE TO VALUE-ADDED PRODUCT
by: LI HE
Published: (2021) -
Collaborative relationship discovery in BIM project delivery: a social network analysis approach
by: Wang, Yongqi, et al.
Published: (2022)