Prioritizing critical management strategies to improving construction productivity: Empirical research in Singapore
10.3390/su12229349
Saved in:
Main Authors: | Hwang, B.-G., Li, Y.-S., Shan, M., Chua, J.-E. |
---|---|
Other Authors: | DEPT OF BUILDING |
Published: |
MDPI AG
2021
|
Subjects: | |
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/199402 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Trade-level productivity measurement: Critical challenges and solutions
by: Hwang, B.-G., et al.
Published: (2014) -
Productivity metrics and its implementations in construction projects: A case study of Singapore
by: Shan, Ming, et al.
Published: (2022) -
Strategies for international construction related consultancy firms to compete in China
by: LI SHAN
Published: (2011) -
An exploratory analysis of risks in green residential building construction projects: The case of Singapore
by: Hwang, B.-G, et al.
Published: (2020) -
DIGITAL TWIN IN SINGAPORE’S CONSTRUCTION INDUSTRY: STATUS QUO, DRIVERS, BARRIERS AND STRATEGIES
by: TAN YU ZHEN
Published: (2021)