Identifying critical bankability criteria for PPP projects: The case of China
10.1155/2018/7860717
Saved in:
Main Authors: | Zhu, L., Chua, D.K.H. |
---|---|
Other Authors: | CIVIL AND ENVIRONMENTAL ENGINEERING |
Format: | Article |
Published: |
Hindawi Limited
2021
|
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/210899 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
DESIGN OF A BANKABLE AND RESILIENT FINANCIAL ARRANGEMENT FOR PPP PROJECTS USING GAME THEORY WITH MULTI-AGENT SIMULATION
by: ZHU LEI
Published: (2016) -
A bankable future
by: CHANG, Jonathan Henry
Published: (2016) -
Analysis of default risks and bankability of privately financed infrastructure projects
by: Kong, De Quan.
Published: (2008) -
Life-cycle financial modelling of long term infrastructure projects "PPP-BOT projects" under uncertainty and risk
by: Attarzadeh, M., et al.
Published: (2014) -
Life-cycle financial modelling of long term infrastructure projects "PPP-BOT projects" under uncertainty and risk
by: Attarzadeh, M., et al.
Published: (2014)