A preliminary prototyping approach for emerging metro-based underground logistics systems: Operation mechanism and facility layout
10.1080/00207543.2020.1844333
Saved in:
Main Authors: | Wanjie Hu, Jianjun Dong, Bon-Gang Hwang, Rui Ren, Zhilong Chen |
---|---|
Other Authors: | BUILDING |
Format: | Article |
Published: |
Taylor & Francis
2022
|
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/214917 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Network Planning Method for Capacitated Metro-Based Underground Logistics System
by: Dong J., et al.
Published: (2019) -
DESIGN AND IMPLEMENTATION OF THE VISUALIZATION WORKFLOW FOR MATERIAL FLOW AND FACILITY LAYOUT AT CAR FOR MFLASH PROTOTYPE
by: MARYUNI (NIM: 23207075), SITI -
The impact of underground logistics system on urban sustainable development: A system dynamics approach
by: Dong, J., et al.
Published: (2021) -
RISK IDENTIFICATION AND ALLOCATION IN UNDERGROUND RAIL CONSTRUCTION JOINT VENTURES: CONTRACTORS’ PERSPECTIVE
by: Bon-Gang Hwang, et al.
Published: (2018) -
Facilities layout by graph decomposition algorithm
by: Lim, Chin Che.
Published: (2008)