COST AND BENEFIT ANALYSIS OF VERTICAL SYSTEM FORMWORK AND PRECAST METHOD OF CONSTRUCTION
Bachelor's
Saved in:
Main Author: | LING, SIEW RU |
---|---|
Other Authors: | BUILDING |
Format: | Dissertation |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/219761 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Language: | English |
Similar Items
-
EVALUATING THE EDUCATION OF CONSTRUCTION SAFETY AND HEALTH RISK MANAGEMENT IN PF4202
by: LEE YI RU YOYO
Published: (2017) -
AN EVALUATION OF DESIGN FOR SAFETY REVIEW PROCESS IN SINGAPORE CONSTRUCTION INDUSTRY; CHALLENGES AND RECOMMENDATIONS
by: JEFFREY WIDJAJA LOWARDI
Published: (2020) -
KNOWLEDGE REPRESENTATION OF WORK AT HEIGHT ACTIVITIES ON CONSTRUCTION SITES
by: YONG RUI FATT
Published: (2014) -
A SYSTEMATIC LITERATURE REVIEW OF CURRENT RESEARCH ON FALL-FROM-HEIGHT ACCIDENTS IN THE CONSTRUCTION INDUSTRY
by: POON LILI
Published: (2013) -
OPTIMAL WASTE RECYCLING AND REDUCTION SYSTEM: A SYSTEMIC APPROACH
by: LIM KOON TING DANIEL
Published: (2013)