PROPOSED BIM-FM FRAMEWORK AND SYSTEM FORTOWNSHIP IMPLEMENTATION AND MANAGEMENT
Bachelor's
Saved in:
Main Author: | WONG JING XUN JUSTIN FRANCIS |
---|---|
Other Authors: | BUILDING |
Format: | Dissertation |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/220037 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Language: | English |
Similar Items
-
EXAMINING THE RELATIONSHIP BETWEEN SCAN-TO-BIM AND ADOPTION RATE OF BIM FOR VARIOUS FM FUNCTIONALITIES IN EXISTING BUILDINGS IN SINGAPORE.
by: LIM ZHI QING
Published: (2022) -
UNDERLYING FACTORS AFFECTING BIM PRODUCTIVITY: BIM MATURITY AND OPTIMIZATION FRAMEWORK
by: Lim Wen Jie Gabriel
Published: (2016) -
A STUDY ON THE ADEQUACY OF SINGAPORE'S TERTIARY BIM EDUCATION IN MEETING JOB EXPECTATIONS AND DEMANDS OF THE BUILDING INDUSTRY
by: NORALIFAH ILYANA BINTE HISHAMUDIN
Published: (2020) -
APPLICATION OF BIM IN TOWN COUNCILS
by: TAN LI NING LYNN
Published: (2019) -
EVALUATION OF AS-BUILT BIM RECONSTRUCTION TECHNOLOGIES FOR BIM-BASED FACILITIES MANAGEMENT
by: ZHUO, ZHENYUN
Published: (2018)