CAUSES OF DELAYS IN THE CONSTRUCTION INDUSTRY: A COMPARISON BETWEEN SINGAPORE, INDONESIA, MALAYSIA, THAILAND AND VIETNAM
Bachelor's
Saved in:
Main Author: | TAN GUO MEI IMY |
---|---|
Other Authors: | BUILDING |
Format: | Dissertation |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/222951 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Language: | English |
Similar Items
-
SINGAPORE'S CONSTRUCTION INDUSTRY AFTER THE SAND BAN
by: TANG WEN AI
Published: (2017) -
BUSINESS CONTINUITY MANAGEMENT IN CONSTRUCTION
by: SIO TECK CHEONG STEPHEN
Published: (2017) -
Multi-criteria performance evaluation of an HVAC control system
by: SASHEENDRAN GOPALAKRISHNAKONE
Published: (2017) -
RELATIONAL STUDY BETWEEN BUILDABILITY AND THE TOTAL BUILDING PERFORMANCE MANDATES OF THERMAL PERFORMANCE AND BUILDING INTEGRITY PERFORMANCE
by: LIM KENG HONG JOHN
Published: (2010) -
BRIDGE CONSTRUCTION IN VIETNAM
by: DOAN HUYNH VAN ANH
Published: (2010)