Kanban assignment problem in serial just-in-time production systems
IIE Transactions (Institute of Industrial Engineers)
Saved in:
Main Authors: | Co, Henry C., Jacobson, Sheldon H. |
---|---|
Other Authors: | DECISION SCIENCES |
Format: | Article |
Published: |
2013
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/44995 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Coping with Uncertainty in Kanban-Controlled Production Systems
by: MOOSA, Sharafali, et al.
Published: (1995) -
Overplanning Factor in Toyota's Formula for Computing the Number of Kanban
by: CO, Henry C., et al.
Published: (1997) -
Performance comparison of multiple product kanban control systems
by: Piplani, Rajesh, et al.
Published: (2019) -
Note on the problem of scheduling a flexible manufacturing system for just-in-time customers
by: Co, H.C., et al.
Published: (2013) -
Study of the kanban control system
by: Lee, Han Siang.
Published: (2011)