A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors
Production Planning and Control
Saved in:
Main Author: | Brah, S.A. |
---|---|
Other Authors: | DECISION SCIENCES |
Format: | Review |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45048 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Comparison of Scheduling Rules in a Flow Shop with Multiple Processors: A Simulation
by: Brah, S.A., et al.
Published: (2013) -
Heuristics for scheduling in a flow shop with multiple processors
by: Brah, S.A., et al.
Published: (2013) -
A water-flow algorithm for flexible flow shop scheduling with intermediate buffers
by: Tran, T.H., et al.
Published: (2014) -
An improved intelligent water drops algorithm for solving multi-objective job shop scheduling
by: Niu, S.H., et al.
Published: (2014) -
Asymptotically optimal schedules for single-server flow shop problems with setup costs and times
by: Iravani, S.M.R., et al.
Published: (2013)