A case study on the management of the development of a large-scale power plant project in East Asia based on design-build arrangement
10.1016/S0263-7863(01)00036-9
Saved in:
Main Authors: | Ling, Y.Y., Lau, B.S.Y. |
---|---|
Other Authors: | BUILDING |
Format: | Article |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45535 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
WATERPROOFING MEMBRANES UNDER SINGAPORE CONDITIONS
by: WONG MAY LING
Published: (2019) -
RISK AND RESILIENCE OF CONSTRUCTION PROJECTS: LARGE VS SMALL PROJECTS
by: LEE SUET LYNN, CHERYN
Published: (2023) -
Design of the proposed power plant for the Martom Rubber Tire Plant
by: Buhain, Marcelino, et al.
Published: (1960) -
DEVELOPMENT OF LARGE-SCALE URBAN INFRASTRUCTURE PROJECTS IN CHINA - CASE STUDY OF A WASTE-TO-ENERGY PROJECTS IN YANGZHOU
by: ZHANG YAJIAN
Published: (2017) -
Design of a power plant
by: Corpuz, Gabriel, et al.
Published: (1959)