Assessing project schedule risk with contingent tasks by spreadsheet-based simulation
Cost Engineering (Morgantown, West Virginia)
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45576 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-45576 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-455762015-01-20T11:04:20Z Assessing project schedule risk with contingent tasks by spreadsheet-based simulation Chao, L.-C. Hsueh, S.-L. BUILDING Design and build Precedence networks Risk analysis Simulation Cost Engineering (Morgantown, West Virginia) 48 3 11-20 CSTED 2013-10-14T04:34:55Z 2013-10-14T04:34:55Z 2006 Article Chao, L.-C.,Hsueh, S.-L. (2006). Assessing project schedule risk with contingent tasks by spreadsheet-based simulation. Cost Engineering (Morgantown, West Virginia) 48 (3) : 11-20. ScholarBank@NUS Repository. 02749696 http://scholarbank.nus.edu.sg/handle/10635/45576 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
country |
Singapore |
collection |
ScholarBank@NUS |
topic |
Design and build Precedence networks Risk analysis Simulation |
spellingShingle |
Design and build Precedence networks Risk analysis Simulation Chao, L.-C. Hsueh, S.-L. Assessing project schedule risk with contingent tasks by spreadsheet-based simulation |
description |
Cost Engineering (Morgantown, West Virginia) |
author2 |
BUILDING |
author_facet |
BUILDING Chao, L.-C. Hsueh, S.-L. |
format |
Article |
author |
Chao, L.-C. Hsueh, S.-L. |
author_sort |
Chao, L.-C. |
title |
Assessing project schedule risk with contingent tasks by spreadsheet-based simulation |
title_short |
Assessing project schedule risk with contingent tasks by spreadsheet-based simulation |
title_full |
Assessing project schedule risk with contingent tasks by spreadsheet-based simulation |
title_fullStr |
Assessing project schedule risk with contingent tasks by spreadsheet-based simulation |
title_full_unstemmed |
Assessing project schedule risk with contingent tasks by spreadsheet-based simulation |
title_sort |
assessing project schedule risk with contingent tasks by spreadsheet-based simulation |
publishDate |
2013 |
url |
http://scholarbank.nus.edu.sg/handle/10635/45576 |
_version_ |
1681083086203256832 |