EOQ, JIT and fixed costs in the ready-mixed concrete industry

10.1016/j.ijpe.2005.03.002

Saved in:
Bibliographic Details
Main Authors: Min, W., Sui Pheng, L.
Other Authors: BUILDING
Format: Article
Published: 2013
Subjects:
Online Access:http://scholarbank.nus.edu.sg/handle/10635/45669
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-45669
record_format dspace
spelling sg-nus-scholar.10635-456692023-10-25T22:56:12Z EOQ, JIT and fixed costs in the ready-mixed concrete industry Min, W. Sui Pheng, L. BUILDING EOQ-JIT cost indifference point Inventory facility Price discount Ready-mixed concrete 10.1016/j.ijpe.2005.03.002 International Journal of Production Economics 102 1 167-180 IJPCE 2013-10-14T04:37:23Z 2013-10-14T04:37:23Z 2006 Article Min, W., Sui Pheng, L. (2006). EOQ, JIT and fixed costs in the ready-mixed concrete industry. International Journal of Production Economics 102 (1) : 167-180. ScholarBank@NUS Repository. https://doi.org/10.1016/j.ijpe.2005.03.002 09255273 http://scholarbank.nus.edu.sg/handle/10635/45669 000236626400012 Scopus
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
topic EOQ-JIT cost indifference point
Inventory facility
Price discount
Ready-mixed concrete
spellingShingle EOQ-JIT cost indifference point
Inventory facility
Price discount
Ready-mixed concrete
Min, W.
Sui Pheng, L.
EOQ, JIT and fixed costs in the ready-mixed concrete industry
description 10.1016/j.ijpe.2005.03.002
author2 BUILDING
author_facet BUILDING
Min, W.
Sui Pheng, L.
format Article
author Min, W.
Sui Pheng, L.
author_sort Min, W.
title EOQ, JIT and fixed costs in the ready-mixed concrete industry
title_short EOQ, JIT and fixed costs in the ready-mixed concrete industry
title_full EOQ, JIT and fixed costs in the ready-mixed concrete industry
title_fullStr EOQ, JIT and fixed costs in the ready-mixed concrete industry
title_full_unstemmed EOQ, JIT and fixed costs in the ready-mixed concrete industry
title_sort eoq, jit and fixed costs in the ready-mixed concrete industry
publishDate 2013
url http://scholarbank.nus.edu.sg/handle/10635/45669
_version_ 1781411381689450496