EOQ, JIT and fixed costs in the ready-mixed concrete industry
10.1016/j.ijpe.2005.03.002
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45669 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-45669 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-456692023-10-25T22:56:12Z EOQ, JIT and fixed costs in the ready-mixed concrete industry Min, W. Sui Pheng, L. BUILDING EOQ-JIT cost indifference point Inventory facility Price discount Ready-mixed concrete 10.1016/j.ijpe.2005.03.002 International Journal of Production Economics 102 1 167-180 IJPCE 2013-10-14T04:37:23Z 2013-10-14T04:37:23Z 2006 Article Min, W., Sui Pheng, L. (2006). EOQ, JIT and fixed costs in the ready-mixed concrete industry. International Journal of Production Economics 102 (1) : 167-180. ScholarBank@NUS Repository. https://doi.org/10.1016/j.ijpe.2005.03.002 09255273 http://scholarbank.nus.edu.sg/handle/10635/45669 000236626400012 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
EOQ-JIT cost indifference point Inventory facility Price discount Ready-mixed concrete |
spellingShingle |
EOQ-JIT cost indifference point Inventory facility Price discount Ready-mixed concrete Min, W. Sui Pheng, L. EOQ, JIT and fixed costs in the ready-mixed concrete industry |
description |
10.1016/j.ijpe.2005.03.002 |
author2 |
BUILDING |
author_facet |
BUILDING Min, W. Sui Pheng, L. |
format |
Article |
author |
Min, W. Sui Pheng, L. |
author_sort |
Min, W. |
title |
EOQ, JIT and fixed costs in the ready-mixed concrete industry |
title_short |
EOQ, JIT and fixed costs in the ready-mixed concrete industry |
title_full |
EOQ, JIT and fixed costs in the ready-mixed concrete industry |
title_fullStr |
EOQ, JIT and fixed costs in the ready-mixed concrete industry |
title_full_unstemmed |
EOQ, JIT and fixed costs in the ready-mixed concrete industry |
title_sort |
eoq, jit and fixed costs in the ready-mixed concrete industry |
publishDate |
2013 |
url |
http://scholarbank.nus.edu.sg/handle/10635/45669 |
_version_ |
1781411381689450496 |