Just-in-time management in precast concrete construction: A survey of the readiness of main contractors in Singapore
10.1108/EUM0000000006107
Saved in:
Main Authors: | Pheng, L.S., Chuan, C.J. |
---|---|
Other Authors: | BUILDING |
Format: | Article |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45748 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
The application of the Just-in-Time philosophy in the Chinese construction industry
by: Pheng, L.S., et al.
Published: (2013) -
How 'just-in-time' wastages can be quantified: Case study of a private condominium project
by: Pheng, L.S., et al.
Published: (2013) -
The application of JIT philosophy to construction: A case study in site layout
by: Pheng, L.S., et al.
Published: (2013) -
ENABLING LEAN THROUGH USING SHARED MENTAL MODELS FOR PRECAST CONSTRUCTION IN SINGAPORE
by: JOY ONG
Published: (2020) -
IMPROVING PRODUCTIVITY OF A PRECAST CONCRETE YARD THROUGH SIMULATION: A CASE STUDY APPROACH
by: LI HUIWEN
Published: (2016)