Just-in-time management of precast concrete components
10.1061/(ASCE)0733-9364(2001)127:6(494)
Saved in:
Main Authors: | Pheng, L.S., Chuan, C.J. |
---|---|
Other Authors: | BUILDING |
Format: | Article |
Published: |
2013
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45750 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Discussion of "just-in-time management of precast concrete components" by Low Sui Pheng and Choong Joo Chuan
by: Howell, G.A., et al.
Published: (2013) -
Just-in-time management in precast concrete construction: A survey of the readiness of main contractors in Singapore
by: Pheng, L.S., et al.
Published: (2013) -
Managing the embodied carbon of precast concrete columns
by: Peng, W., et al.
Published: (2014) -
Just-in-time management for airports
by: Pheng, L.S., et al.
Published: (2014) -
Modeling just-in-time purchasing in the ready mixed concrete industry
by: Min, W., et al.
Published: (2013)