Measuring the impact of rework on construction cost performance
10.1061/(ASCE)0733-9364(2009)135:3(187)
Saved in:
Main Authors: | , , , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45771 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-45771 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-457712024-11-10T16:54:23Z Measuring the impact of rework on construction cost performance Hwang, B.-G. Thomas, S.R. Haas, C.T. Caldas, C.H. BUILDING Construction costs Construction industry Construction management Failures Measurement Performance characteristics 10.1061/(ASCE)0733-9364(2009)135:3(187) Journal of Construction Engineering and Management 135 3 187-198 JCEMD 2013-10-14T04:39:56Z 2013-10-14T04:39:56Z 2009 Article Hwang, B.-G., Thomas, S.R., Haas, C.T., Caldas, C.H. (2009). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management 135 (3) : 187-198. ScholarBank@NUS Repository. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187) 07339364 http://scholarbank.nus.edu.sg/handle/10635/45771 000263400900006 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
Construction costs Construction industry Construction management Failures Measurement Performance characteristics |
spellingShingle |
Construction costs Construction industry Construction management Failures Measurement Performance characteristics Hwang, B.-G. Thomas, S.R. Haas, C.T. Caldas, C.H. Measuring the impact of rework on construction cost performance |
description |
10.1061/(ASCE)0733-9364(2009)135:3(187) |
author2 |
BUILDING |
author_facet |
BUILDING Hwang, B.-G. Thomas, S.R. Haas, C.T. Caldas, C.H. |
format |
Article |
author |
Hwang, B.-G. Thomas, S.R. Haas, C.T. Caldas, C.H. |
author_sort |
Hwang, B.-G. |
title |
Measuring the impact of rework on construction cost performance |
title_short |
Measuring the impact of rework on construction cost performance |
title_full |
Measuring the impact of rework on construction cost performance |
title_fullStr |
Measuring the impact of rework on construction cost performance |
title_full_unstemmed |
Measuring the impact of rework on construction cost performance |
title_sort |
measuring the impact of rework on construction cost performance |
publishDate |
2013 |
url |
http://scholarbank.nus.edu.sg/handle/10635/45771 |
_version_ |
1821191104869957632 |