Identifying key sources of rework affecting construction cost performance
COBRA 2009 - Construction and Building Research Conference of the Royal Institution of Chartered Surveyors
Saved in:
Main Author: | Hwang, B.-G. |
---|---|
Other Authors: | BUILDING |
Format: | Conference or Workshop Item |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45944 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Measuring the Impact of Building Information Modeling on Rework
by: Kay Wei Yang
Published: (2017) -
Performance evaluation and enhancement of multistage manufacturing systems with rework loops
by: Cao, Y., et al.
Published: (2014) -
Enhancing rework techniques in microelectronics components for reusability
by: Toh, Wei Yu
Published: (2024) -
THE CAUSES AND IMPACT OF REWORK ON TIME PERFORMANCE OF SINGAPORE CONSTRUCTION PROJECTS
by: Yang Shimin
Published: (2011) -
Subcontracting and rework cost sharing in engineering-procurement-construction projects
by: CHEN, Zhenzhen, et al.
Published: (2023)