How 'just-in-time' wastages can be quantified: Case study of a private condominium project

Construction Management and Economics

Saved in:
Bibliographic Details
Main Authors: Pheng, L.S., Tan, S.K.L.
Other Authors: SCHOOL OF BUILDING & REAL ESTATE
Format: Article
Published: 2013
Subjects:
Online Access:http://scholarbank.nus.edu.sg/handle/10635/46441
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-46441
record_format dspace
spelling sg-nus-scholar.10635-464412015-01-10T13:52:21Z How 'just-in-time' wastages can be quantified: Case study of a private condominium project Pheng, L.S. Tan, S.K.L. SCHOOL OF BUILDING & REAL ESTATE Just-in-time Productivity Wastes quantification Construction Management and Economics 16 6 621-635 CMECF 2013-10-16T02:01:54Z 2013-10-16T02:01:54Z 1998 Article Pheng, L.S.,Tan, S.K.L. (1998). How 'just-in-time' wastages can be quantified: Case study of a private condominium project. Construction Management and Economics 16 (6) : 621-635. ScholarBank@NUS Repository. 01446193 http://scholarbank.nus.edu.sg/handle/10635/46441 NOT_IN_WOS Scopus
institution National University of Singapore
building NUS Library
country Singapore
collection ScholarBank@NUS
topic Just-in-time
Productivity
Wastes quantification
spellingShingle Just-in-time
Productivity
Wastes quantification
Pheng, L.S.
Tan, S.K.L.
How 'just-in-time' wastages can be quantified: Case study of a private condominium project
description Construction Management and Economics
author2 SCHOOL OF BUILDING & REAL ESTATE
author_facet SCHOOL OF BUILDING & REAL ESTATE
Pheng, L.S.
Tan, S.K.L.
format Article
author Pheng, L.S.
Tan, S.K.L.
author_sort Pheng, L.S.
title How 'just-in-time' wastages can be quantified: Case study of a private condominium project
title_short How 'just-in-time' wastages can be quantified: Case study of a private condominium project
title_full How 'just-in-time' wastages can be quantified: Case study of a private condominium project
title_fullStr How 'just-in-time' wastages can be quantified: Case study of a private condominium project
title_full_unstemmed How 'just-in-time' wastages can be quantified: Case study of a private condominium project
title_sort how 'just-in-time' wastages can be quantified: case study of a private condominium project
publishDate 2013
url http://scholarbank.nus.edu.sg/handle/10635/46441
_version_ 1681083231718342656