Collection and evaluation of projected time gap using CAMDAS

Road and Transport Research

Saved in:
Bibliographic Details
Main Authors: Wang, Z., Chin, H.C., Lim, K.B.
Other Authors: CIVIL ENGINEERING
Format: Article
Published: 2014
Online Access:http://scholarbank.nus.edu.sg/handle/10635/50676
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-50676
record_format dspace
spelling sg-nus-scholar.10635-506762024-11-12T21:53:46Z Collection and evaluation of projected time gap using CAMDAS Wang, Z. Chin, H.C. Lim, K.B. CIVIL ENGINEERING MECHANICAL ENGINEERING Road and Transport Research 12 2 42-53 RTRRE 2014-04-23T07:07:37Z 2014-04-23T07:07:37Z 2003-06 Article Wang, Z.,Chin, H.C.,Lim, K.B. (2003-06). Collection and evaluation of projected time gap using CAMDAS. Road and Transport Research 12 (2) : 42-53. ScholarBank@NUS Repository. 10375783 http://scholarbank.nus.edu.sg/handle/10635/50676 NOT_IN_WOS Scopus
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
description Road and Transport Research
author2 CIVIL ENGINEERING
author_facet CIVIL ENGINEERING
Wang, Z.
Chin, H.C.
Lim, K.B.
format Article
author Wang, Z.
Chin, H.C.
Lim, K.B.
spellingShingle Wang, Z.
Chin, H.C.
Lim, K.B.
Collection and evaluation of projected time gap using CAMDAS
author_sort Wang, Z.
title Collection and evaluation of projected time gap using CAMDAS
title_short Collection and evaluation of projected time gap using CAMDAS
title_full Collection and evaluation of projected time gap using CAMDAS
title_fullStr Collection and evaluation of projected time gap using CAMDAS
title_full_unstemmed Collection and evaluation of projected time gap using CAMDAS
title_sort collection and evaluation of projected time gap using camdas
publishDate 2014
url http://scholarbank.nus.edu.sg/handle/10635/50676
_version_ 1821221791813599232