A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy

10.1016/j.cirpj.2009.08.003

Saved in:
Bibliographic Details
Main Authors: Sun, H., Huang, H.-C., Jaruphongsa, W.
Other Authors: INDUSTRIAL & SYSTEMS ENGINEERING
Format: Article
Published: 2014
Subjects:
Online Access:http://scholarbank.nus.edu.sg/handle/10635/54213
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-54213
record_format dspace
spelling sg-nus-scholar.10635-542132024-11-10T11:29:10Z A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy Sun, H. Huang, H.-C. Jaruphongsa, W. INDUSTRIAL & SYSTEMS ENGINEERING Economic lot scheduling problem Genetic algorithm Meta-heuristic Power-of-two 10.1016/j.cirpj.2009.08.003 CIRP Journal of Manufacturing Science and Technology 2 1 29-34 2014-06-16T09:28:46Z 2014-06-16T09:28:46Z 2009 Article Sun, H., Huang, H.-C., Jaruphongsa, W. (2009). A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy. CIRP Journal of Manufacturing Science and Technology 2 (1) : 29-34. ScholarBank@NUS Repository. https://doi.org/10.1016/j.cirpj.2009.08.003 17555817 http://scholarbank.nus.edu.sg/handle/10635/54213 000214831800005 Scopus
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
topic Economic lot scheduling problem
Genetic algorithm
Meta-heuristic
Power-of-two
spellingShingle Economic lot scheduling problem
Genetic algorithm
Meta-heuristic
Power-of-two
Sun, H.
Huang, H.-C.
Jaruphongsa, W.
A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy
description 10.1016/j.cirpj.2009.08.003
author2 INDUSTRIAL & SYSTEMS ENGINEERING
author_facet INDUSTRIAL & SYSTEMS ENGINEERING
Sun, H.
Huang, H.-C.
Jaruphongsa, W.
format Article
author Sun, H.
Huang, H.-C.
Jaruphongsa, W.
author_sort Sun, H.
title A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy
title_short A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy
title_full A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy
title_fullStr A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy
title_full_unstemmed A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy
title_sort genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy
publishDate 2014
url http://scholarbank.nus.edu.sg/handle/10635/54213
_version_ 1821220334276182016