Reducing tardy jobs by integrating process planning and scheduling functions
10.1080/00207540802216388
Saved in:
Main Authors: | Wang, J., Zhang, Y.F., Nee, A.Y.C., Wang, Y.F., Fuh, J.Y.H. |
---|---|
Other Authors: | MECHANICAL ENGINEERING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/61213 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
An agent-based distributed process planning and scheduling system
by: Wang, Y.F., et al.
Published: (2014) -
An integrated approach to reactive scheduling subject to machine breakdown
by: Wang, Y.F., et al.
Published: (2014) -
Optimization for process planning and scheduling in parts manufacturing
by: WANG YIFA
Published: (2011) -
The early-tardy distinct due date machine scheduling problem with job splitting
by: HO KAH YUAN, BERNICE
Published: (2010) -
Algorithms for scheduling problems with weighted earliness-tardiness penalty
by: FENG GUANG
Published: (2010)