Scheduling of flexible-sequenced process plans in a mould manufacturing shop
10.1007/s001700200144
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/61264 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-61264 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-612642023-10-30T21:45:56Z Scheduling of flexible-sequenced process plans in a mould manufacturing shop Gan, P.Y. Lee, K.S. MECHANICAL ENGINEERING Branch and bound Flexible-sequences process plans Mould manufacturing Scheduling 10.1007/s001700200144 International Journal of Advanced Manufacturing Technology 20 3 214-222 IJATE 2014-06-17T06:32:59Z 2014-06-17T06:32:59Z 2002 Article Gan, P.Y., Lee, K.S. (2002). Scheduling of flexible-sequenced process plans in a mould manufacturing shop. International Journal of Advanced Manufacturing Technology 20 (3) : 214-222. ScholarBank@NUS Repository. https://doi.org/10.1007/s001700200144 02683768 http://scholarbank.nus.edu.sg/handle/10635/61264 000177874100006 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
Branch and bound Flexible-sequences process plans Mould manufacturing Scheduling |
spellingShingle |
Branch and bound Flexible-sequences process plans Mould manufacturing Scheduling Gan, P.Y. Lee, K.S. Scheduling of flexible-sequenced process plans in a mould manufacturing shop |
description |
10.1007/s001700200144 |
author2 |
MECHANICAL ENGINEERING |
author_facet |
MECHANICAL ENGINEERING Gan, P.Y. Lee, K.S. |
format |
Article |
author |
Gan, P.Y. Lee, K.S. |
author_sort |
Gan, P.Y. |
title |
Scheduling of flexible-sequenced process plans in a mould manufacturing shop |
title_short |
Scheduling of flexible-sequenced process plans in a mould manufacturing shop |
title_full |
Scheduling of flexible-sequenced process plans in a mould manufacturing shop |
title_fullStr |
Scheduling of flexible-sequenced process plans in a mould manufacturing shop |
title_full_unstemmed |
Scheduling of flexible-sequenced process plans in a mould manufacturing shop |
title_sort |
scheduling of flexible-sequenced process plans in a mould manufacturing shop |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/61264 |
_version_ |
1781782014414815232 |