The economic lot scheduling problem under extended basic period and power-of-two policy

10.1007/s11590-009-0154-5

Saved in:
Bibliographic Details
Main Authors: Sun, H., Huang, H.-C., Jaruphongsa, W.
Other Authors: INDUSTRIAL & SYSTEMS ENGINEERING
Format: Article
Published: 2014
Subjects:
Online Access:http://scholarbank.nus.edu.sg/handle/10635/63358
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-63358
record_format dspace
spelling sg-nus-scholar.10635-633582023-10-30T20:10:52Z The economic lot scheduling problem under extended basic period and power-of-two policy Sun, H. Huang, H.-C. Jaruphongsa, W. INDUSTRIAL & SYSTEMS ENGINEERING ELSP Heuristic Parametric search algorithm Power-of-two 10.1007/s11590-009-0154-5 Optimization Letters 4 2 157-172 2014-06-17T07:03:08Z 2014-06-17T07:03:08Z 2010 Article Sun, H., Huang, H.-C., Jaruphongsa, W. (2010). The economic lot scheduling problem under extended basic period and power-of-two policy. Optimization Letters 4 (2) : 157-172. ScholarBank@NUS Repository. https://doi.org/10.1007/s11590-009-0154-5 18624472 http://scholarbank.nus.edu.sg/handle/10635/63358 000276366600001 Scopus
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
topic ELSP
Heuristic
Parametric search algorithm
Power-of-two
spellingShingle ELSP
Heuristic
Parametric search algorithm
Power-of-two
Sun, H.
Huang, H.-C.
Jaruphongsa, W.
The economic lot scheduling problem under extended basic period and power-of-two policy
description 10.1007/s11590-009-0154-5
author2 INDUSTRIAL & SYSTEMS ENGINEERING
author_facet INDUSTRIAL & SYSTEMS ENGINEERING
Sun, H.
Huang, H.-C.
Jaruphongsa, W.
format Article
author Sun, H.
Huang, H.-C.
Jaruphongsa, W.
author_sort Sun, H.
title The economic lot scheduling problem under extended basic period and power-of-two policy
title_short The economic lot scheduling problem under extended basic period and power-of-two policy
title_full The economic lot scheduling problem under extended basic period and power-of-two policy
title_fullStr The economic lot scheduling problem under extended basic period and power-of-two policy
title_full_unstemmed The economic lot scheduling problem under extended basic period and power-of-two policy
title_sort economic lot scheduling problem under extended basic period and power-of-two policy
publishDate 2014
url http://scholarbank.nus.edu.sg/handle/10635/63358
_version_ 1781782234517209088