Construction resource scheduling with genetic algorithms
Journal of Construction Engineering and Management
Saved in:
Main Authors: | Chan, W.-T., Chua, D.K.H., Kannan, G. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/65349 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Scheduling with co-evolving resource availability profiles
by: Chua, D.K.H., et al.
Published: (2014) -
EVOLVING CONSTRUCTION SCHEDULES UNDER RESOURCE CONSTRAINTS
by: KANNAN GOVINDAN
Published: (2020) -
A time-cost trade-off model with resource consideration using genetic algorithm
by: Chua, D.K.H., et al.
Published: (2014) -
Impact of variability on construction schedules
by: SHEN LIJUN, et al.
Published: (2014) -
Precast production scheduling with Genetic Algorithms
by: Chan, W.T., et al.
Published: (2014)