Integrated quay crane and yard truck schedule problem in container terminals
10.1016/S1007-0214(10)70089-4
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/65722 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-65722 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-657222015-02-22T21:09:34Z Integrated quay crane and yard truck schedule problem in container terminals Cao, J. Shi, Q. Lee, D.-H. CIVIL ENGINEERING container terminal heuristic algorithm mixed integer programming scheduling 10.1016/S1007-0214(10)70089-4 Tsinghua Science and Technology 15 4 467-474 TSTEF 2014-06-17T08:19:55Z 2014-06-17T08:19:55Z 2010 Article Cao, J.,Shi, Q.,Lee, D.-H. (2010). Integrated quay crane and yard truck schedule problem in container terminals. Tsinghua Science and Technology 15 (4) : 467-474. ScholarBank@NUS Repository. <a href="https://doi.org/10.1016/S1007-0214(10)70089-4" target="_blank">https://doi.org/10.1016/S1007-0214(10)70089-4</a> 10070214 http://scholarbank.nus.edu.sg/handle/10635/65722 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
country |
Singapore |
collection |
ScholarBank@NUS |
topic |
container terminal heuristic algorithm mixed integer programming scheduling |
spellingShingle |
container terminal heuristic algorithm mixed integer programming scheduling Cao, J. Shi, Q. Lee, D.-H. Integrated quay crane and yard truck schedule problem in container terminals |
description |
10.1016/S1007-0214(10)70089-4 |
author2 |
CIVIL ENGINEERING |
author_facet |
CIVIL ENGINEERING Cao, J. Shi, Q. Lee, D.-H. |
format |
Article |
author |
Cao, J. Shi, Q. Lee, D.-H. |
author_sort |
Cao, J. |
title |
Integrated quay crane and yard truck schedule problem in container terminals |
title_short |
Integrated quay crane and yard truck schedule problem in container terminals |
title_full |
Integrated quay crane and yard truck schedule problem in container terminals |
title_fullStr |
Integrated quay crane and yard truck schedule problem in container terminals |
title_full_unstemmed |
Integrated quay crane and yard truck schedule problem in container terminals |
title_sort |
integrated quay crane and yard truck schedule problem in container terminals |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/65722 |
_version_ |
1681086343741964288 |