Production scheduling for precast plants using a flow shop sequencing model
10.1061/(ASCE)0887-3801(2002)16:3(165)
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/66030 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-66030 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-660302023-10-25T21:37:56Z Production scheduling for precast plants using a flow shop sequencing model Chan, W.T. Hu, H. CIVIL ENGINEERING Algorithms Concrete, precast Management methods Manufacturing facilities Productivity Scheduling 10.1061/(ASCE)0887-3801(2002)16:3(165) Journal of Computing in Civil Engineering 16 3 165-174 JCCEE 2014-06-17T08:23:26Z 2014-06-17T08:23:26Z 2002-07 Article Chan, W.T., Hu, H. (2002-07). Production scheduling for precast plants using a flow shop sequencing model. Journal of Computing in Civil Engineering 16 (3) : 165-174. ScholarBank@NUS Repository. https://doi.org/10.1061/(ASCE)0887-3801(2002)16:3(165) 08873801 http://scholarbank.nus.edu.sg/handle/10635/66030 000176288000002 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
Algorithms Concrete, precast Management methods Manufacturing facilities Productivity Scheduling |
spellingShingle |
Algorithms Concrete, precast Management methods Manufacturing facilities Productivity Scheduling Chan, W.T. Hu, H. Production scheduling for precast plants using a flow shop sequencing model |
description |
10.1061/(ASCE)0887-3801(2002)16:3(165) |
author2 |
CIVIL ENGINEERING |
author_facet |
CIVIL ENGINEERING Chan, W.T. Hu, H. |
format |
Article |
author |
Chan, W.T. Hu, H. |
author_sort |
Chan, W.T. |
title |
Production scheduling for precast plants using a flow shop sequencing model |
title_short |
Production scheduling for precast plants using a flow shop sequencing model |
title_full |
Production scheduling for precast plants using a flow shop sequencing model |
title_fullStr |
Production scheduling for precast plants using a flow shop sequencing model |
title_full_unstemmed |
Production scheduling for precast plants using a flow shop sequencing model |
title_sort |
production scheduling for precast plants using a flow shop sequencing model |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/66030 |
_version_ |
1781782677243822080 |