Quay crane scheduling with handling priority in port container terminals

10.1080/03052150701686366

Saved in:
Bibliographic Details
Main Authors: Lee, D.-H., Wang, H.Q., Miao, L.
Other Authors: CIVIL ENGINEERING
Format: Article
Published: 2014
Subjects:
Online Access:http://scholarbank.nus.edu.sg/handle/10635/66043
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-66043
record_format dspace
spelling sg-nus-scholar.10635-660432023-10-26T07:49:00Z Quay crane scheduling with handling priority in port container terminals Lee, D.-H. Wang, H.Q. Miao, L. CIVIL ENGINEERING Genetic algorithm Handling priority Port container terminal Quay crane scheduling 10.1080/03052150701686366 Engineering Optimization 40 2 179-189 EGOPA 2014-06-17T08:23:34Z 2014-06-17T08:23:34Z 2008-02 Article Lee, D.-H., Wang, H.Q., Miao, L. (2008-02). Quay crane scheduling with handling priority in port container terminals. Engineering Optimization 40 (2) : 179-189. ScholarBank@NUS Repository. https://doi.org/10.1080/03052150701686366 0305215X http://scholarbank.nus.edu.sg/handle/10635/66043 000253808600005 Scopus
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
topic Genetic algorithm
Handling priority
Port container terminal
Quay crane scheduling
spellingShingle Genetic algorithm
Handling priority
Port container terminal
Quay crane scheduling
Lee, D.-H.
Wang, H.Q.
Miao, L.
Quay crane scheduling with handling priority in port container terminals
description 10.1080/03052150701686366
author2 CIVIL ENGINEERING
author_facet CIVIL ENGINEERING
Lee, D.-H.
Wang, H.Q.
Miao, L.
format Article
author Lee, D.-H.
Wang, H.Q.
Miao, L.
author_sort Lee, D.-H.
title Quay crane scheduling with handling priority in port container terminals
title_short Quay crane scheduling with handling priority in port container terminals
title_full Quay crane scheduling with handling priority in port container terminals
title_fullStr Quay crane scheduling with handling priority in port container terminals
title_full_unstemmed Quay crane scheduling with handling priority in port container terminals
title_sort quay crane scheduling with handling priority in port container terminals
publishDate 2014
url http://scholarbank.nus.edu.sg/handle/10635/66043
_version_ 1781782678431858688