Scheduling with co-evolving resource availability profiles
Civil Engineering Systems
Saved in:
Main Authors: | Chua, D.K.H., Chan, W.T., Kannan, G. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/66126 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
EVOLVING CONSTRUCTION SCHEDULES UNDER RESOURCE CONSTRAINTS
by: KANNAN GOVINDAN
Published: (2020) -
Integrated resource allocation and scheduling in a bidirectional flowshop with multimachine and COS constraints
by: Zhao, Z.Y.J., et al.
Published: (2014) -
An adaptive co-ordinate based scheduling mechanism for grid resource management with resource availabilities
by: Benjamin Khoo, B.T., et al.
Published: (2014) -
A time-cost trade-off model with resource consideration using genetic algorithm
by: Chua, D.K.H., et al.
Published: (2014) -
New meta-heuristics for the resource-constrained project scheduling problem
by: Lim, A., et al.
Published: (2013)