Use of a WBS matrix to improve interface management in projects
10.1061/(ASCE)0733-9364(2006)132:1(67)
Saved in:
Main Authors: | Chua, D.K.H., Godinot, M. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/66362 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
The work breakdown structure matrix: A tool to improve interface management
by: GODINOT MYRIAM YVONNE FRANCOISE
Published: (2010) -
Process-parameter-interface model for design management
by: Chua, D.K.H., et al.
Published: (2014) -
Accountability and project management: a convergence of objectives
by: Leong, C.
Published: (2013) -
Prototype web-based construction project management system
by: Chan, S.-L., et al.
Published: (2013) -
FEASIBILITY OF BLOCKCHAIN TECHNOLOGY IN PROJECT AND CONSTRUCTION MANAGEMENT
by: ZHOU XINYUAN
Published: (2023)