Erratum to Integrated control chart system for time-between-events monitoring in a multistage manufacturing system (International Journal of Advanced Manufacturing Technology DOI: 10.1007/s00170-007-1338-8)

10.1007/s00170-008-1475-8

Saved in:
Bibliographic Details
Main Authors: Shamsuzzaman, M., Xie, M., Goh, T.N., Zhang, H.Y.
Other Authors: INDUSTRIAL & SYSTEMS ENGINEERING
Format: Others Erratum
Published: 2014
Online Access:http://scholarbank.nus.edu.sg/handle/10635/67969
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-67969
record_format dspace
spelling sg-nus-scholar.10635-679692024-11-13T15:20:09Z Erratum to Integrated control chart system for time-between-events monitoring in a multistage manufacturing system (International Journal of Advanced Manufacturing Technology DOI: 10.1007/s00170-007-1338-8) Shamsuzzaman, M. Xie, M. Goh, T.N. Zhang, H.Y. INDUSTRIAL & SYSTEMS ENGINEERING 10.1007/s00170-008-1475-8 International Journal of Advanced Manufacturing Technology 40 3-4 382- IJATE 2014-06-18T05:33:02Z 2014-06-18T05:33:02Z 2009-01 Others Erratum Shamsuzzaman, M., Xie, M., Goh, T.N., Zhang, H.Y. (2009-01). Erratum to Integrated control chart system for time-between-events monitoring in a multistage manufacturing system (International Journal of Advanced Manufacturing Technology DOI: 10.1007/s00170-007-1338-8). International Journal of Advanced Manufacturing Technology 40 (3-4) : 382-. ScholarBank@NUS Repository. https://doi.org/10.1007/s00170-008-1475-8 02683768 http://scholarbank.nus.edu.sg/handle/10635/67969 NOT_IN_WOS Scopus
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
description 10.1007/s00170-008-1475-8
author2 INDUSTRIAL & SYSTEMS ENGINEERING
author_facet INDUSTRIAL & SYSTEMS ENGINEERING
Shamsuzzaman, M.
Xie, M.
Goh, T.N.
Zhang, H.Y.
format Others
Erratum
author Shamsuzzaman, M.
Xie, M.
Goh, T.N.
Zhang, H.Y.
spellingShingle Shamsuzzaman, M.
Xie, M.
Goh, T.N.
Zhang, H.Y.
Erratum to Integrated control chart system for time-between-events monitoring in a multistage manufacturing system (International Journal of Advanced Manufacturing Technology DOI: 10.1007/s00170-007-1338-8)
author_sort Shamsuzzaman, M.
title Erratum to Integrated control chart system for time-between-events monitoring in a multistage manufacturing system (International Journal of Advanced Manufacturing Technology DOI: 10.1007/s00170-007-1338-8)
title_short Erratum to Integrated control chart system for time-between-events monitoring in a multistage manufacturing system (International Journal of Advanced Manufacturing Technology DOI: 10.1007/s00170-007-1338-8)
title_full Erratum to Integrated control chart system for time-between-events monitoring in a multistage manufacturing system (International Journal of Advanced Manufacturing Technology DOI: 10.1007/s00170-007-1338-8)
title_fullStr Erratum to Integrated control chart system for time-between-events monitoring in a multistage manufacturing system (International Journal of Advanced Manufacturing Technology DOI: 10.1007/s00170-007-1338-8)
title_full_unstemmed Erratum to Integrated control chart system for time-between-events monitoring in a multistage manufacturing system (International Journal of Advanced Manufacturing Technology DOI: 10.1007/s00170-007-1338-8)
title_sort erratum to integrated control chart system for time-between-events monitoring in a multistage manufacturing system (international journal of advanced manufacturing technology doi: 10.1007/s00170-007-1338-8)
publishDate 2014
url http://scholarbank.nus.edu.sg/handle/10635/67969
_version_ 1821195749913788416