A hybrid GA-CP approach for production scheduling
10.1109/ICNC.2009.703
Saved in:
Main Authors: | Hu, H., Chan, W.-T. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/74030 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
An application of genetic algorithms to precast production scheduling
by: Chan, W.-T., et al.
Published: (2014) -
A hybrid evolutionary approach for heterogeneous multiprocessor scheduling
by: Goh, C.K., et al.
Published: (2014) -
An improved approach for quay crane scheduling with non-crossing constraints
by: Lee, D.-H., et al.
Published: (2014) -
Constraint programming approach to precast production scheduling
by: Chan, W.T., et al.
Published: (2014) -
Impact of variability on construction schedules
by: SHEN LIJUN, et al.
Published: (2014)