A simulation-ga based model for production planning in precast plant
10.1109/WSC.2006.322957
Saved in:
Main Authors: | Zhai, X., Tiong, R.L.K., Bjornsson, H.C., Chua, D.K.H. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/74039 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Simulation-based planning for precast production with two critical resources
by: Zhai, X., et al.
Published: (2014) -
Simulation-based planning for precast production with two critical resources
by: Zhai, X., et al.
Published: (2014) -
Integrated planning and scheduling for precast concrete production
by: Zhai, Xiaofeng
Published: (2008) -
Production scheduling for precast plants using a flow shop sequencing model
by: Chan, W.T., et al.
Published: (2014) -
Study of factors affecting precast plant productivity in Singapore
by: Chan, Poh Ching.
Published: (2008)