Simulation-based planning for precast production with two critical resources
10.1109/WSC.2008.4736362
Saved in:
Main Authors: | , , , |
---|---|
Other Authors: | |
Format: | Conference or Workshop Item |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/74354 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-74354 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-743542015-03-05T02:50:56Z Simulation-based planning for precast production with two critical resources Zhai, X. Tiong, R.L.K. Bjornsson, H.C. Chua, D.K.H. CIVIL ENGINEERING 10.1109/WSC.2008.4736362 Proceedings - Winter Simulation Conference 2519-2526 WSCPD 2014-06-19T05:51:58Z 2014-06-19T05:51:58Z 2008 Conference Paper Zhai, X.,Tiong, R.L.K.,Bjornsson, H.C.,Chua, D.K.H. (2008). Simulation-based planning for precast production with two critical resources. Proceedings - Winter Simulation Conference : 2519-2526. ScholarBank@NUS Repository. <a href="https://doi.org/10.1109/WSC.2008.4736362" target="_blank">https://doi.org/10.1109/WSC.2008.4736362</a> 9781424427086 08917736 http://scholarbank.nus.edu.sg/handle/10635/74354 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
country |
Singapore |
collection |
ScholarBank@NUS |
description |
10.1109/WSC.2008.4736362 |
author2 |
CIVIL ENGINEERING |
author_facet |
CIVIL ENGINEERING Zhai, X. Tiong, R.L.K. Bjornsson, H.C. Chua, D.K.H. |
format |
Conference or Workshop Item |
author |
Zhai, X. Tiong, R.L.K. Bjornsson, H.C. Chua, D.K.H. |
spellingShingle |
Zhai, X. Tiong, R.L.K. Bjornsson, H.C. Chua, D.K.H. Simulation-based planning for precast production with two critical resources |
author_sort |
Zhai, X. |
title |
Simulation-based planning for precast production with two critical resources |
title_short |
Simulation-based planning for precast production with two critical resources |
title_full |
Simulation-based planning for precast production with two critical resources |
title_fullStr |
Simulation-based planning for precast production with two critical resources |
title_full_unstemmed |
Simulation-based planning for precast production with two critical resources |
title_sort |
simulation-based planning for precast production with two critical resources |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/74354 |
_version_ |
1681087914155442176 |